FINANCIAL MODEL BASELINE CONTROL
Create Financial Model Working Copies
Keep the approved baseline unchanged while assumptions, formulas or scenarios are revised in a controlled copy.

01 / CONTEXT
Define the control decision
Editing the only baseline can silently change growth rates, price assumptions, headcount, linked cells, scenario switches or outputs. A named working copy preserves the approved reference while allowing a documented planning update.
Keep the approved baseline unchanged while assumptions, formulas or scenarios are revised in a controlled copy.
02 / PROCEDURE
Run the control sequence
- 01
Copy the baseline into a named restricted workspace.
- 02
Record the analyst, reason, planning period and scenario.
- 03
Use fictional entities and figures in technical tests.
- 04
Compare formulas, links, assumptions, units and scenario controls.
- 05
Require model-owner approval before replacing the baseline.
03 / EVIDENCE
Preserve proof without personal data
A defensible control record identifies the model owner, planning period, scenario, currency, authoritative path, permitted accounts, restriction mode, version ID, approval date, checksum evidence, recovery owner and next review date. It should not contain confidential forecasts, live company figures, credentials or personal data. Use fictional entities and non-operational figures during every technical test.
Recheck the arrangement after changes to Windows, spreadsheet software, linked data, planning workflow, storage, Folder Protect, permissions, service accounts or FP&A roles. Confirm both usability and recovery: an authorized analyst should read the approved baseline, an unauthorized account should not alter it, and the recovery owner should restore a separately held copy without depending on the protected folder. Preserve unexpected behavior before changing controls.
Keep the claim narrow. Local restrictions may reduce accidental writing, deletion or access on a tested Windows path, but they do not encrypt data, establish formula accuracy, approve assumptions, validate forecasts, prove accounting compliance, administer identities, provide version history or replace backup. Escalate those requirements to the spreadsheet, planning and governance systems designed to meet them.
Ask a second analyst to follow the written procedure without verbal help. Record whether that person can identify the approved baseline, create a working copy, recognize the version ID, interpret denied access and find the recovery owner. This usability check reveals ambiguous paths, hidden linked-data dependencies and undocumented knowledge before a spreadsheet, planning, storage or staffing change. Correct the procedure, repeat the test with fictional data and retain only minimal evidence.
04 / BOUNDARY
State what the control cannot prove
A working-copy process does not establish formula correctness, forecast quality, accounting treatment, approval authority or version completeness.
Validate the exact Windows account, spreadsheet application, linked-data workflow, storage path and current product release. If encryption, formula validation, assumption approval, immutable history, identity governance or regulated retention are required, select systems designed for those jobs rather than broadening a desktop restriction claim.
05 / SOURCES
Primary references
References support specific controls and do not imply endorsement.